I'm working on another weaving. I want to have at least two more done before the Art Tour.
Lately I can't get enough of working on my knitted rug. There are pictures up over at flickr and at ravelry. I'm going to have to work on xmas presents again soon...
Sunday, October 26, 2008
Tuesday, October 21, 2008
Leclerc Table Loom
This is my newest piece of equipment and I love it. I'm probably going to take it apart this weekend and clean it up. It's got one part that needs to be replaced, lots of rust and dust, but overall, a great deal.
Jano
Status: No Longer Produced
Mechanisms: Table
Shafts: 4
Weaving Width: 20"
Features: First Leclerc Table Loom, does not fold, metal side levers, optional treadle stand.
Lately I'm knitting... a rug, a couple scarves, socks, and slippers!
Jano
Status: No Longer Produced
Mechanisms: Table
Shafts: 4
Weaving Width: 20"
Features: First Leclerc Table Loom, does not fold, metal side levers, optional treadle stand.
Lately I'm knitting... a rug, a couple scarves, socks, and slippers!
Friday, October 10, 2008
knitting in the bellybutton of california: wow! a contest!!!
knitting in the bellybutton of california: wow! a contest!!!
I just love contests... this is inspiring me! I think I'll have to post a contest too. Look for one by the end of the month. This to celebrate the resurrection of my crafty blogging. Starting today!
I just love contests... this is inspiring me! I think I'll have to post a contest too. Look for one by the end of the month. This to celebrate the resurrection of my crafty blogging. Starting today!
First Ever Sock
I'm still alive! Mostly busy making gifts and learning new processes.... oh and making stuff for the holiday festivals. This is the first sock I've made, and I'm making slippers too.
Yarn started on every bobbin, wool in the combs, wool in the carder, weaving on the loom... Must finish projects!
Yarn started on every bobbin, wool in the combs, wool in the carder, weaving on the loom... Must finish projects!
Subscribe to:
Posts (Atom)